Welcome to Stavanger

Are you IMO MSC.1392 compliant?
LIFEBOAT RE-HOOKING DEADLINE 01/07/2019
Lifeboat Inspection ARE YOU COMPLIANT WITH SOLAS CHAPTER III?


SOLAS Chapter III stipulates the need for servicing, annual inspections and a thorough 5 year inspection and load testing of lifesaving appliances (LSA), launching arrangements and lifeboat release & retrieval systems (LRRS). Survivalcraft responded to this approval requirement and offers an extensive inspection, servicing and maintenance programme available globally. 
It is required that for all ships in operation, on-load release mechanisms not complying with paragraphs 4.4.7.6.4 to 4.4.7.6.6 of the LSA Code, as amended by resolution MSC.320(89) have to be replaced or modified not later than the next scheduled dry-docking after 1 July 2014, but not later than 1 July 2019.

Have a look at the GSIS data base from IMO to check the status of your installed hooks: http://gisis.imo.org/Public/Default.aspx